Skip to content

Choose the value-maximising project portfolio under a budget, an hours cap, prerequisites and exclusions

Exact prompt

# Choose next quarter's project portfolio Inputs: `projects.csv` (cost, engineering hours and estimated value of each candidate project, plus prerequisites) and `constraints.json` (budget, available hours, pairs that can't both be funded). Pick the set of projects that maximises total value. - Total cost must not exceed the budget, and total hours must not exceed the available hours. - A project can only be funded if all its prerequisites are funded too. - At most one project of each mutually exclusive pair may be funded. - Then answer one what-if: if the budget were cut by 10% (hours unchanged), what is the best total value achievable? Write `out/portfolio.json`: `{"selected": [<project ids, sorted>], "total_value": <n>, "total_cost": <n>, "total_hours": <n>, "value_if_budget_cut_10pct": <n>}`. ## How this run works - Work on your own: nobody will answer questions in this task, and writing to `ask/` counts against the run. - Write only under `out/`. Create `out/` if it is missing. Inputs are synthetic; don't fetch anything from the network. - Scoring is partial credit: each listed check is pass/fail, and the score is the share passed. Numbers are compared to within 0.005 unless the task says otherwise.

Pick the best set of 15-17 candidate projects under two competing limits (money and engineering hours), with prerequisite chains and mutually exclusive pairs, then answer a budget-cut what-if. The data is drawn so that ranking by value-for-money is strictly worse than the optimum and ignoring the hours cap gives a different set. The hidden key is the unique exact optimum. Original benchmark task written for usecaserank.com (not based on a specific public post). Headless, offline run on a reproducible fixture. Each run's notes say how its cost was measured (estimates are marked). Folder-restore note: this run's output files under work/out/ were lost in a 1:22 AM ET restore on Oct 21, 2026. The trace, step-in exchanges and output-hash list were checked against the recorded SHA-256 values and match; the hashes of the individual output files inside that list can no longer be recomputed. Measured data unchanged.

Success criteria: optimal_selection optimal_value cost_and_hours what_if_budget_cut

Best model for this task so far: Gemma 4 31B Instruct (Venice) (thinking on) (success, $0.0025, 2m).

Run this on another model

All runs (6)

100% pass rate across 6 eligible runs: 6 pass, 0 partial, 0 fail. Partial and failed runs are listed below with everything else.ⓘ

Runs for this use case
ModelCostTimeStep-insⓘAutonomyOutcomeTrustⓘDateCompare
QQwen3 Coder 480B Turbo (Venice)thinking on$0.021m0Fully autonomouspassTrust 80%2026-10-29
GGemma 4 31B Instruct (Venice)thinking on$0.00252m0Fully autonomouspassTrust 80%2026-10-28
DDeepSeek V4.1 Flash (Venice)thinking on$0.00309s0Fully autonomouspassTrust 80%2026-10-28
AClaude Opus 5.5default · thinking on$0.1016s0Fully autonomouspassTrust 80%2026-10-21
AClaude Haiku 5.5default · thinking on$0.003212s0Fully autonomouspassTrust 80%2026-10-21
AClaude Sonnet 5.5default · thinking off$0.0410s0Fully autonomouspassTrust 80%2026-10-21

Embed this result

A live badge for this use case. It links back here and updates as new runs are published.

UseCaseRank badge for Choose the value-maximising project portfolio under a budget, an hours cap, prerequisites and exclusions

Get new runs and ranking changes weekly

Which models got better or cheaper on real tasks like this one.