Skip to content

Claude Opus 5.5 (effort default (no --effort flag) · thinking on) on Find vendor contracts whose non-renewal notice deadline is near, through amendments, month-end dates and business-day notice periods

AClaude Opus 5.5default · thinking on · Claude Code 2.1.299 (headless -p) · cloud · 2026-10-21 · by @bobsiopener

Trust 80%Fully autonomoussuccess · first try
Estimated cost
$0.13
Wall time
27s
Human step-ins
0
Outcome
Pass

Compare with other models on this task →

Summary

Exact prompt

# Which vendor contracts need a non-renewal decision soon? Inputs: `contracts.csv`, `amendments.csv` and `calendar.json` (today's date and public holidays). Today is the date in `calendar.json`. For every contract that auto-renews, find the current term's end date and the last day on which a non-renewal notice can still be given. - A term of N months starting on date S ends the day before S plus N months. If that month is shorter, S plus N months falls on its last day (so 31 January plus 1 month is 28 or 29 February). - A contract renews for its renewal term each time a term ends, so the current term is the one that contains today. Each renewal term starts on the day after the previous term ends. - Notice must arrive at least the notice period before the term ends: the deadline is the end date minus the notice period. Periods are in days, months (same month rule as above) or business days (Monday to Friday, not holidays; count back from the end date, not counting the end date itself). - Only signed amendments change a contract; a later signed amendment to the same field replaces an earlier one, by effective date. - If the current term's deadline has already passed, the contract will renew: report the next term instead (its end date and deadline). Write `out/renewals.json`: `{"contracts": {"<contract_id>": {"term_end": "YYYY-MM-DD", "notice_deadline": "YYYY-MM-DD"}, ...}, "decide_within_30_days": [<ids whose reported deadline is from today to today + 30 days inclusive, sorted>], "missed_current_term": [<ids whose current-term deadline has passed, sorted>]}`. Leave contracts that don't auto-renew out of `contracts`. ## How this run works - Work on your own: nobody will answer questions in this task, and writing to `ask/` counts against the run. - Write only under `out/`. Create `out/` if it is missing. Inputs are synthetic; don't fetch anything from the network. - Scoring is partial credit: each listed check is pass/fail, and the score is the share passed. Numbers are compared to within 0.005 unless the task says otherwise.

Work out the current term end and notice deadline for 18-24 auto-renewing contracts as of a fixed date. Notice periods mix days, months and business days with holidays, several start on the 29th-31st, amendments include drafts that must not apply, and some deadlines have already passed so the next term is the one to report. Thirty-day months, applying drafts, or treating business days as calendar days each change the answer. Original benchmark task written for usecaserank.com (not based on a specific public post). Headless, offline run on a reproducible fixture. Each run's notes say how its cost was measured (estimates are marked). Folder-restore note: this run's output files under work/out/ were lost in a 1:22 AM ET restore on Oct 21, 2026. The trace, step-in exchanges and output-hash list were checked against the recorded SHA-256 values and match; the hashes of the individual output files inside that list can no longer be recomputed. Measured data unchanged.

Success criteria: deadlines decide_soon missed amendments

Setup notes: Batch 19 case u04-renewal-notice-deadlines (offline, synthetic inputs, seed 1249226905). Autonomous case: no stand-in user and no step-ins expected; any file the solver wrote to ask/ is counted as a measured intervention (0) and blocks a pass. Prompt = TASK.md verbatim. Hidden key kept outside the solver's work dir. Scored with the case's scorer (python3 score.py WORKDIR KEYDIR, absolute paths); pass = every check true and no ask/ files. Tools: Read/Write/Edit/Glob/Grep/Bash, web disabled. Single run, no retries. 1-min load average at scoring 0.11 (8 cores). Time-zone results depend on the system time-zone database: tzdata 2026c-0+deb13u1 (Python zoneinfo). Claude Code's own reported cost for claude-opus-5.5: $0.132464. Score: 4/4. Cost is an ESTIMATE: measured tokens x pricing.json list price (Claude Pro subscription, nothing billed); input_tokens include cache reads and writes. Single run.

Estimated cost List-price estimate; not actually billed.

Metrics

Estimated cost
$0.13
Wall time
27s
Human step-ins
0
Turns
3
Model usage
ModelInput tokOutput tokCost
AClaude Opus 5.5anthropic/claude-opus-5.5effort default (no --effort flag) · thinking on59,0522,364$0.13

Reproduce this run

  1. Use the use case prompt on the use case page.
  2. Same setup: Claude Opus 5.5 (anthropic/claude-opus-5.5, effort default (no --effort flag) · thinking on) via Claude Code 2.1.299 (headless -p), cloud.
  3. It counts as a success only if it meets every success criterion: deadlines decide_soon missed amendments
  4. Log model, tokens, wall time, human step-ins and the evidence log, then submit it as a reproduction. A different model? Submit a head-to-head rerun.

How runs are scored: Methodology.

Was this useful?

⇄ Rerun on another model

Automated checks

Trust 80% comes from these checks (how Trust % works).

Evidence log
[
 {
  "duration_api_ms": 25580,
  "stop_reason": "end_turn",
  "session_id": "[REDACTED]",
  "total_cost_usd": 0.1324644,
  "usage": {
   "input_tokens": 6,
   "cache_creation_input_tokens": 9404,
   "cache_read_input_tokens": 49642,
   "output_tokens": 2364,
   "output_tokens_details": {
    "thinking_tokens": 615
   },
   "server_tool_use": {
    "web_search_requests": 0,
    "web_fetch_requests": 0
   },
   "service_tier": "standard",
   "cache_creation": {
    "ephemeral_1h_input_tokens": 9404,
    "ephemeral_5m_input_tokens": 0
   },
   "inference_geo": "global",
   "iterations": [
    {
     "input_tokens": 2,
     "output_tokens": 963,
     "cache_read_input_tokens": 19351,
     "cache_creation_input_tokens": 2199,
     "cache_creation": {
      "ephemeral_5m_input_tokens": 0,
      "ephemeral_1h_input_tokens": 2199
     },
     "type": "message"
    }
   ],
   "speed": "standard",
   "fallback_credit": null
  },
  "modelUsage": {
   "claude-opus-5-5": {
    "inputTokens": 6,
    "outputTokens": 2364,
    "cacheReadInputTokens": 49642,
    "cacheCreationInputTokens": 9404,
    "webSearchRequests": 0,
    "costUSD": 0.1324644,
    "contextWindow": 1000000,
    "maxOutputTokens": 128000,
    "thinkingTokens": 615,
    "canonicalModel": "claude-opus-5-5",
    "provider": "firstParty",
    "costBasis": "list"
   }
  },
  "permission_denials": [],
  "terminal_reason": "completed",
  "fast_mode_state": "off",
  "fast_mode_disabled_reason": "sdk_opt_in_required",
  "subagent_stats": {
   "spawned": 0,
   "requested": {
    "background": 0,
    "foreground": 0,
    "unset": 0
   },
   "started_in_background": 0,
   "max_depth": 0,
   "spawned_by_subagents": 0,
   "completed": 0,
   "failed": 0,
   "killed": {
    "parent": 0,
    "user": 0,
    "system": 0
   },
   "refused": {
    "depth_limit": 0,
    "concurrency_limit": 0,
    "budget": 0
   },
   "by_type": {}
  },
  "safety_stops": 0,
  "is_error": false,
  "num_turns": 3,
  "subtype": "success",
  "api_error_status": null,
  "result": "I wrote `out/renewals.json`. It covers 17 auto-renewing contracts. I checked the output by reading it through; there's no answer key to compare against.\n\n**Decide within 30 days** (deadline between 2026-10-20 and 2026-11-19):\n\n| Contract | Notice deadline | Term end |\n|---|---|---|\n| CT-358 | 2026-10-29 | 2026-12-13 |\n| CT-315 | 2026-10-30 | 2026-11-30 |\n| CT-303 | 2026-11-13 | 2026-12-14 |\n| CT-335 | 2026-11-16 | 2027-02-14 |\n\nCT-358 has the earliest deadline, nine days away. That deadline is for its next term, because the current one was missed.\n\n**Current-term deadline already passed** (these will renew): CT-316, CT-328, CT-358 and CT-387. For each one the file reports the next term instead.\n\n- **CT-387 has no deadline you can still meet.** Its renewal term is 1 month but notice is 3 months, so even the next term's deadline (2026-08-27) passed before today. I reported that date as the rules say. Since it isn't from today onward, CT-387 is not in the 30-day list. In practice, every future deadline for this contract will already have passed when its term starts.\n- **Amendments:** CT-320 is the only contract with a signed amendment. That amendment turned off auto-renewal, so CT-320 is left out. All the other amendments were drafts and I ignored them.\n- **Excluded contracts:** CT-340, CT-347, CT-348, CT-354 and CT-375 don't auto-renew, so they're left out too.\n- **How renewal dates are worked out:** each renewal term is counted from the day after the previous term ended, not from the original start date. After a short month the day of the month can drift. For example, CT-387's start day moves from the 29th to the 28th after a February. If the checker measures every term from the original start date instead, a few dates could differ by a day.\n\nThe script I used is `/tmp/r.py`, outside the work folder.",
  "ttft_ms": 2852,
  "type": "result",
  "duration_ms": 25949,
  "uuid": "[REDACTED]",
  "ttft_stream_ms": 1840,
  "time_to_request_ms": 245,
  "first_content_frame_ms": 1840,
  "queued_turn_count": 0,
  "result_index": 0
 }
]

Get new runs and ranking changes weekly